Pile Foundation Excavation
Specialized excavation support for deep bored piling, soil extraction, earth retention shoring, and metro box foundations.
Deep Foundation & Retaining Wall Excavations
Modern high-load infrastructure, particularly metro rail bridges and flyovers, relies on deep pile foundations. DS INFRA provides expert support for bored pile excavations, micro-piles layouts, and shoring works since 2004. We excavate soil cores, dig trenches for retaining walls, and prepare ground surfaces to handle heavy piling rigs.
Deep excavation apparatus
We operate the most effective crawler and backhoe units for pile assistance:
- JCB JS-205 Long Boom for deep shaft digs
- JCB JS-205 bucket for rapid soil clearance
- JCB 3DX Backhoe for micro-piles digging
- Tata Hyva Fleet for immediate wet-clay logistics
Why Partner with DS INFRA
Deep Shaft Verticality
Our excavator operators are skilled in maintaining precise verticality during shaft digs to allow easy concrete rebar cage insertion.
Shoring & Trench Protection
Expert execution of trench shoring excavations to prevent soil collapse during metro station developments.
- Deep Reach:Up to 11.5 Meters
- Shoring Support:GI Partition ready
- Clients:DMRC Contractors
- Experience:Delhi NCR since 2004
Service Inquiry
Submit piling details